I realized that I probably should not be down here if Matt was wearing a mask to avoid the dust, haha.
It was attached to the stairs and there is a bit of glue underneath so it won't slide around on the tile
"YES!!!"
"Ya"....
Oops! Will need to fill that. Then I continued to mock him until he kicked me off the stairs, haha.
Seriously, I leave for a half hour and things go very quickly downstairs. Sorry I don't have more pictures!
I didn't think I would like the balusters on the outside look, but I really don't mind it at all.
Wow I really need to clean and grout renew!!!
Doesn't look like much but at least it's a lot safer so far!
- Wood filler where needed
- Cut and install the rise pieces - vertical parts to the stairs
- Paint the rise pieces
- Cut and stain the flat stair pieces
- Paint the stair guard
- Install the flat stair pieces
We'll probably get this project done by the end of next week because I can help with all the painting. And don't think I've been doing nothing! I've stained the tops of the butcher block island and started painting the sides. Still have one more coat, then I'll assemble. Can't wait to share this project!!!